A new teak deck is being laid and vacuum glued

The entire deck of a HR46 is covered with glue

The seamed port teak strips are carefully put in place

Now it is time for the starboard teak deck to be put in place

And now the afterdeck

The entire teak deck is covered with plastic sheets and made air tight before the vacuum gluing starts.

It was once an ugly teak deck that has become a beautiful Phoenix